905-715-2447 Fall Hours: Friday 10:00 am-5:00 pm, Saturday 10:00 am-3:00 pm 3301 Sideroad 10, Bradford, ON Canada
905-715-2447 Fall Hours: Friday 10:00 am-5:00 pm, Saturday 10:00 am-3:00 pm 3301 Sideroad 10, Bradford, ON Canada

Pond Aeration

Christy's Red Hot Blue Glue PVC Cement

SKU 29969
C$14.99
1
Save this product for later
Share this product with your friends
Christy's Red Hot Blue Glue PVC Cement
Product Details
Brand: Aquascape

Christy's Red Hot Blue Glue PVC Cement - 4 oz

Preferred by Contractors, Christy's Red Hot Blue Glue is the “The Original” Blue Glue that quickly bonds PVC pipe & fittings for fast pressurization and maximum productivity. This high quality, premium formulation is designed to bond in wet, dry and humid conditions and can be used with or without a primer in most non pressurized systems. Use with flexible PVC pond tubing.

Features:

  • Use with rigid and flexible PVC pond tubing
  • Contractor Preferred… “The Original” Blue Glue that quickly bonds PVC pipe & fittings for fast pressurization and maximum productivity
  • Designed to bond in wet, dry and humid conditions
  • Industry's fastest acting solvent cement with the most active ingredients
  • Can be used without a primer for non-pressure systems up to 6″ and pressure systems below 4″, if local codes permit
  • For PVC pipe and fitting applications; potable water, pressure, non-pressure, conduit, drain, duct, DWV and sewer


DIRECTIONS: For use on rigid and Flexible PVC pipe. Stir and use as is.

1) Cut pipe square, deburr, and wipe clean. Make a trial dry fit – pipe should fit snugly 1/3 – 2/3 snugly into fitting. Use an adequate sized applicator at last 1/2” size of pipe diameter Dauber, brush, roller or swab. Apply Christy’s Primer if required by local code. Uniform Plumbing Code requires the use of a purple primer. CAN BE USED WITHOUT A PRIMER IF LOCAL CODES PERMIT for non-pressure systems up to 6″ and pressure systems below 4″.

2) Apply a full, even coat of cement to outside of pipe and medium coat of cement o inside of fitting. Coat pipe a second time. Quickly assemble joint while cement is still fluid on both parts. If dry, pipe and fitting must be re-coated. Push and rotate pipe into fitting until pipe bottoms in socket. Hold together until joint sets (approx. 30 seconds).

3) Remove excess cement. Leave joint undisturbed for at least 10 minutes. Full joint strength should be reached within 24 hours depending upon temperature and humidity. See installation Guide for product set and cure time and additional information. STORE BETWEEN 40 °F (4 °C) and 110 °F (43 °C) DO NOT TEST WITH AIR.